[BC] SBE
Barry Mishkind
barry
Thu May 12 18:29:51 CDT 2005
At 04:11 PM 5/12/2005, Mike McCarthy wrote
>The criteria for notification as I recall is all licensees withn 150
>miles in all directions and a key hole arc +/- 5 deg. either side of
>the path azimuth out to 250 miles. This is regardless of the other
>station's path azimuth, power height, or any other technical parameter.
I did not realize it was done in such a
stupid over blown fashion (I haven't
had to file one of these since before,
and the info I asked for ... from SBE
... is still in transit).
>I concur that requirement is excessive and we (SBE) tried to get the
>FCC to reduce the requirements. But they said no. Seems the
>commerical coordinators had their fix in...
Now, if the NAB has the muscle to get
congress to order the FCC to delete
licenses for engineers, LPFM, and
any requirement for news and
public affairs ... how is it that what
is called the most powerful lobby
on the Hill (ok, let's assume top 3)
can't have resolved this without
the expense and silliness we see?
Can anyone tell us what happened
here? It can't be the commercial
coordinators had more pull than the
NAB..... That I will not believe.
>
_______________________________________________________________________
Barry Mishkind - Tucson, AZ - 520-296-3797
More information about the Broadcast
mailing list