[BC] Arrays separated by highways
Dan Walthers
danwalthers1
Tue Nov 22 12:03:13 CST 2005
Not sure if the RF goes across the street, but there are some control lines,
monitor cables, lighting cables going overhead. I think the plan is to get
everything underground. I'll take a close look going home.
Leroy Dietrich is the current chief. He and I share the Tower of the
Americas site with Lotus.
Dan
-----Original Message-----
From: broadcast-bounces at radiolists.net
[mailto:broadcast-bounces at radiolists.net] On Behalf Of DHultsman5 at aol.com
Sent: Sunday, November 20, 2005 6:56 PM
To: broadcast at radiolists.net
Subject: Re: [BC] Arrays separated by highways
In a message dated 11/20/2005 1:56:30 P.M. Central Standard Time,
danwalthers1 at sbcglobal.net writes:
They're currently in the process of getting all the permits to drill under
Eisenhauer to replace the open feed line across the street with new control
lines and coax. BTW Eisenhauer is a four lane boulevard and fairly heavily
traveled.
Dan:
I am not certain did the open wire cross under the street or go over the
street. I seem to remember it going under the road thru a bridge.
Coleman Barber was the Chief Engineer there when they were a McLendon
station.
Dave Hultsman
_______________________________________________
This is the BROADCAST mailing list
To send to the list, email: broadcast at radiolists.net For sub changes,
archives and info on this other lists: http://www.radiolists.net/
More information about the Broadcast
mailing list