On Tuesday 10 February 2009 05:34 pm, Xmitters at aol.com wrote:
> I suppose eventually the power company will ask where all the electrical
> load is that you wanted to feed. You could buy some kind of big electrical load
> ,
> and fire the sucker up once in a while to keep them off your back.
>
> I realize that this would be an incredibly dirty trick to pull, but if you
> drew the "high" load you specified once in a while, I don't see what they could
>
> do about it.
>
> "Well, I did not say I was going to draw 2.5 megawatts ALL the time, and you
> didn't ask."
Reminds me of the wind tunnel at NASA Lewis Research Center in Cleveland.
( Lewis has since been down-graded to John Glen )
They literally phone the power company before cranking up the wind tunnel
as extra generators are needed to provide the power.
Hey, generating super-sonic wind takes power ! LOTS of power.
--