[BC] Another site vandalized
Mike McCarthy
towers at mre.com
Thu Dec 22 11:48:58 CST 2011
>> Now...to design a vandal resistant shroud to sit over the strap running
>> up the side of the pier to the ball gap and not impact the base
>> impedance
Going up the pier to the ball gap, I'll epoxy and rivet the strap to the
pier and then epoxy some sheet fiberglass over top the strap to stiffen,
conceal, and make it impossible to snip anywhere along it's length except
at the ball gap. At which point, it's simply vandalism.
Going up to the ATU, taking some .188" sheet formed into a 4.5" x 2" U,
galvanize and create a 4.5" x 4" shround to go around the existing
conduits and new strap, bolting together with tamperproof nuts, and
mounting to the concrete slab with tamperproof bolts.
If that's not a deterant, then it's time to revisit the whole site security.
MM