[BC] Horror story in the making??????
SHAFFER, RANDY L
RandyShaffer
Thu Jul 14 23:23:19 CDT 2005
Jerry wrote-
>TV Engineers have the time, and many have the knowledge for this type of
>work; some of them have or had water-cooled transmitters, therefore are
>familiar with plumbing. TV Engineers don't really work anyway, just plug a
>few cables in every now and then.
(snip)
Actually, I can't disagree with the first part. We run five of those systems and 2 solid state transmitters. It seems like it is always time for another water change.
Of course our news department seems to think the latter. We can never seem to do enough for them.
One of our producers actually thought we should be on a plane to Japan to find the bad ribbon cable for the production switcher. He doesn't think we are working hard enough to find a solution. We tracked down nearly a dozen leads and no one seems to have the parts. So it may come to a trip to Japan at some point.:)
Randy Shaffer
WLYH-TV/WHP-TV
Clear Channel Television
Harrisburg, PA 17110
More information about the Broadcast
mailing list