When bonehead got the X1000B put in, he just wired that into the GE BT20A and left the GE running out to the tower. That didn't hlep the signal and he refused to fix it. I also found out a power upgrade to ABOUT(approximately) 750 Watts could be had by simply spending $2500 for the engineering and filing fees. He refused to do that as well. Paul